Alert no. 481 | 13 July 2026 | Version 1

Dead-man control defeated on QDS bolter

What happened?

  • During a pre-start inspection of a QDS bolter, an operator identified a plastic zip-tie restraining a dead-man lever in the 'on' position.
  • Safety critical hold-to-run controls must not be restrained, bypassed or defeated, and their correct operation must be verified before the plant is used.
  • The machine was stood down and moved to a safe location for investigation. The investigation is ongoing.

How did it happen?

During a pre-start inspection at an underground coal mine, an operator identified a plastic zip-tie restraining the dead-man lever of a QDS bolter in the 'on' position.

The zip-tie bypassed the intended two-handed operating safety measure and could allow hydraulic functions without continuous engagement of the dead-man control. This risks accidental activation and could expose people near the machine to crush, entanglement and struck-by hazards, with the potential for serious injury or death.

The machine was immediately stood down, the district ERZ controller was notified, and the bolter was moved to a safe location for further examination. No injury was reported. The event was notified to RSHQ as a high potential incident.

The investigation is ongoing and, at the time of publication, has not established who installed the zip-tie or when it was installed.

QDS bolter control station showing the zip-tie restraining the dead-man lever

Figure 1 - QDS bolter control station showing the zip-tie restraining the dead-man lever.

QDS bolter involved in the incident

Figure 2 - QDS bolter involved in the incident.

Recommendations

  • Machinery should only be operated as intended and in line with established site procedures.
  • Do not alter a safety-critical control, except through the mine’s formal plant-modification and change-management process. This should include risk assessment, competent engineering or designer input, authorisation, documentation and functional testing before the plant is returned to service.
  • Site senior executives (SSEs) should ensure QDS bolters and similar hydraulically operated plant are inspected for any device or arrangement that restrains, bypasses or defeats a dead-man, hold-to-run, or other control.
  • Ensure pre-start inspections include a functional test that checks if safety-critical controls are working and respond as expected, including stopping or preventing further actuation of the relevant hazardous function.
  • A visual inspection alone may not identify a defeated or ineffective controls.
  • Confirm that releasing the dead-man or hold-to-run control causes the machine to respond as designed, including stopping or preventing further actuation of the relevant hazardous function.
  • Restrained, bypassed, damaged or non-functioning safety-critical controls should be treated as serious defects. Stand the plant down and apply the mine’s defect-management, isolation and tagging procedures. Preserve the condition of the plant and notify the relevant supervisor or ERZ controller so the circumstances can be investigated.
  • Supervisors should periodically verify the quality of pre-start inspections and reinforce that safety controls must not be defeated for operational convenience.
  • Inspect similar plant and review recent pre-start, defect and maintenance records for evidence of repeated defects, unauthorised alterations or ineffective functional checks.

References and further information

Authorised by Jacques Le Roux - chief-inspector-coal

Contact:

Issued by Resources Safety & Health Queensland

Safety: This information is a guide only and is issued to promote safety through experience. It is not to be taken as a statement of law and must not be construed to waive or modify any legal obligation.
Placement: Place this announcement on noticeboards and ensure all relevant people in your organisation receive a copy.