| Mines safety alert | No.156 V 1 | 13 February 2007
Towing of longwall chocks almost results in fatalities
Mine type
Coal mines—longwall
Incident
A longwall shearer was being used to tow and realign some tailgate chocks. The longwall was mining through badly faulted and disturbed ground at the time. During the task, the tow string and its rigging broke away from an anchor point on one of the chocks. This caused the string and its rigging to recoil violently. Some of the rigging glanced off two workers, who suffered facial cuts, bruising, chipped teeth and a lacerated neck. They could easily have been killed.
Equipment
Longwall shearer, tailgate chocks and tow string (comprising 2 x 25-tonne shackles, 1 x 75-tonne kevlar sling, 1 x 12-tonne shackle, anti-topple ram-attachment chain, swivel bracket and mounting pin).
Hazard
Uncontrolled release of energy.
Cause
- The tow-string rigging was not capable of withstanding the forces applied. The shearer— capable of applying more than 60 tonnes of force through the rigging—was attached to:
- a 25-tonne shackle, which was connected to a
- 75-tonne kevlar sling, which was connected to a
- 25-tonne shackle, which was connected to a
- 12-tonne shackle, which was connected to an
- anti-topple ram-attachment chain and swivel bracket, which was connected to an
- anti-topple ram-mounting pin on the tailgate chock.
- The anti-topple ram-mounting pin on the longwall chock—the attachment point, where the failure occurred—was not capable of withstanding the forces applied.
- The application of the towing force could not be measured and was based on the shearer operator's 'feel'.
- The towing force intensified as the chock was raised to the roof.
The risk assessment for the task underestimated the forces applied to the tow string and the attachment point on the tailgate chock.
Comments and recommendations
The investigation of the accident revealed that the towing/pulling of chocks for realignment and other longwall equipment is common practice throughout the industry.
- All towing/pulling components and attachment points need to be rated to withstand the forces being applied.
- Towing/pulling forces need to be controlled.
- Risk assessments must have sufficient technical input to identify all the hazards present.
- As nearly all the components in the tow string are lifting-plant components, a standard operating procedure (SOP) must be developed, as required by:
Section 72 of the Coal Mining Safety and Health Regulation, which includes:
(e) selecting, maintaining and using lifting plant
(g) ensuring the safety of persons when plant is being towed.
In light of this incident, it is strongly recommended that mines review their SOPs to ensure they are adequate for the tasks being undertaken on the site.
Contact: minesafetyandhealth@dnrm.qld.gov.au
Issued by Queensland Department of Mines and Energy