Slurry pump explosion

What happened?

A 10/8 slurry pump exploded after becoming deadheaded during operation. The explosion propelled the associated suction pipe work several metres together with the cover plate causing significant damage to surrounding structures. There was no worker in the vicinity at the time.

How did it happen?

The investigation identified that a modification to the PLC code incorrectly allowed the pump to continue running outside its designated automatic start/stop sequence with the suction and discharge valves closed. This allowed the slurry inside the pump to become superheated and resulted in the pump explosion. The failure occurred on the pump casing bolts, allowing the impeller and pump casing to remain largely intact.
The modification to the PLC took place five years ago and bridged out the interlock that would have prevented the pump from running with the suction and discharge valves closed.
No change management process had been applied when the bridge was installed.

Recommendations

  • Change management processes should occur whenever a proposed modification to a process may have an impact on the safety and health of workers. The modification should be authorised at an appropriate level of authority, and be documented and understood by operators.
  • Where critical controls are in place to prevent catastrophic events, a regular check should be carried out to verify that the control is effective.
  • Operators should have a basic understanding of the process and of the safety critical controls that are in place.

Authorised by Trevor Brown -

Contact: Richard Horsburgh, Authorised Officer , +61 7 4028 5623

Issued by Queensland Department of Natural Resources and Mines

Placement: Place this announcement on noticeboards and ensure all relevant people in your organisation receive a copy.